Here’s What’s Happening on the Second Floor - College of Charleston Libraries

June 3, 2014
Uncategorized

bringing-the-gypsum-from-the-truck-into-the-library-225x300 Here’s What’s Happening on the Second Floor

Bringing the gypsum from the truck into the library.

hoses-carrying-the-gypsum-225x300 Here’s What’s Happening on the Second Floor

Hoses carryingthe gypsum.

the-first-area-for-the-pour-225x300 Here’s What’s Happening on the Second Floor

First area for the pour.

continuing-the-first-area-300x300 Here’s What’s Happening on the Second Floor

Continuing the first area.

pouring-and-leveling-the-gypsum-300x300 Here’s What’s Happening on the Second Floor

Pouring and leveling the gypsum.

note-the-boots-300x300 Here’s What’s Happening on the Second Floor

nice-boots-300x300 Here’s What’s Happening on the Second Floor

leveling-300x300 Here’s What’s Happening on the Second Floor

prepping-for-the-pour-300x300 Here’s What’s Happening on the Second Floor

laying-out-the-bases-for-the-carriages-225x300 Here’s What’s Happening on the Second Floor

Laying out and building the bases for the carriages.

beginning-to-build-the-carriages--300x300 Here’s What’s Happening on the Second Floor

Addlestone Library is open to the College of Charleston community and affiliates via card access. Visitors may access Addlestone Library Monday-Friday, 9am-5pm, and must present a government issued ID and sign in upon entry.

X